The summer of 2013 will go down in history as the supreme victory of planning, coordination, outstanding teamwork, and cooperative weather as Cricket Hill completed a major renovation of the main barn! By design, all the improvements help both the horses and the people, clients and staff alike. It all started with redoing the indoor arena and adding high performance “TravelLight” footing. Then came the complete power washing of the structure inside and out, stalls and all. Painting the gigantic roof proceded at the same time. The two wash stalls were refurbished and all grooming bays rematted. The finishing touch was the biggest job of all: paving the two 150-foot aisles and entrances to the arena with rubber tiles. An excavator and roller squeeked down each aisle, cement sills were poured at each end and the tiles went down, see below. Phew!